Powered By Kitlog Pro v2.0
Steves Web Site
SparrowHawk I
All
3-13-2009
< Previous Log Entry
Next Log Entry >
Date:
3-13-2009
Number of Hours:
2.50
Manual Reference:
Brief Description:
Battery Box, Prerotator, Bearing Support
Betsy was home for Spring Break. We installed the longer pre-rotator belt. For the belt, I used a Mileage Maker 435K6MK (1105 mm).
Once that belt was on, then it was finally time to install the bearing support for the main sprocket on the EJ25.
Next we made the Battery Box and mounting brackets. A very successful day.
Betsy cutting battery box
Steve cutting Battery Box
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
SparrowHawk I Home
Category
# Logs
# Hours
All
261
784
Avionics
19
42
Cabin
29
118
Controls
33
129
Electrical
44
131
Empennage
30
94
Engine
36
104
Exhaust
2
4
Fuel System
17
34
Fuselage
1
Heater
1
3
Miscellaneous
27
84
None
1
0
Prop
3
4
Rotor Head
5
8
Tools
1
1
Wheels
5
10
Wings
7
18
Copyright © 2001-2024 Matronics. All Rights Reserved.