KitLog pro

Powered By Kitlog Pro v2.0

Flandy Rv-10
' style=
Date:  6-30-2010
Number of Hours:  3.50
Manual Reference:  SafeAir1 and 18-8
Brief Description:  Tested Lt Main Tank and More Aux Tank Install

Tested left main fuel tank- again- small leak associated with aft baffle.

Drilled and installed nutplates on four forward mounts. Tightened bolts and clamped aft doubler in place. Match drilled holes for rivets and attach bolt. Riveted doubler in place and riveted nutplate in place.

Completed match drilling fuel pump rib doulber and riveted in place. Enlarged forward tooling hole for fuel line connection.
' style=

Aft attach doubler

Aft attach doubler

' style=

Aux Tank installed

Aux Tank installed

' style=

Inboard rib doubler

Inboard rib doubler

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.