KitLog pro

Powered By Kitlog Pro v2.0

Flandy Rv-10
Work Logs Found: 475
Category Work Time: 1411 Hours
 Date
Hours
Work Log Summary

Details

 06-17-2016
6.00
Cowling Day #35 and Seat belts
Details

 03-17-2016
5.00
Cabin Heat and Cowling Day #2
Details
     

 03-16-2016
5.00
Cabin heat mount
Details
       

 03-09-2016
5.00
Cabin Heat exchanger and more
Details
       

 12-11-2015
3.00
Cabin Punch list #2
Details

 12-10-2015
2.00
Cabin Punch list
Details

 12-09-2015
2.00
More finish work and fuel system
Details

 12-01-2015
4.00
Misc cabin and FWF systems
Details
       

 11-28-2015
2.00
Tunnel closure and more
Details

 11-27-2015
1.50
Fuel system and tunnel work
Details

 11-17-2015
1.50
Tunnel work
Details

 11-12-2015
3.00
Fuel system and cowling work
Details
       

 11-10-2015
2.00
Engine sensors and cooler valve
Details
     

 11-09-2015
4.50
More fuel system
Details
       

 11-08-2015
3.00
Fuel system work
Details
       

 11-05-2015
1.50
FWF fuel system
Details
       

 11-02-2015
4.00
Root Fairing done, Propeller Arrival
Details
     

 10-27-2015
3.00
Fuel system work
Details
     

 10-24-2015
5.00
Fairing Pin hole filling
Details
       

 10-22-2015
4.50
Wheel Pants and Farings Compete
Details
     

 10-21-2015
4.50
Fuel system and nose tire fairing
Details
       

 10-19-2015
4.00
Fuel system- Part Deux
Details

 10-17-2015
2.00
Right wheel pant
Details

 10-16-2015
2.50
Wheelpants and wingwalk
Details
       

 10-15-2015
2.50
Interior side panel install
Details
     

 10-06-2015
2.50
Interior work
Details

 09-23-2015
4.00
Altn Flap UP power
Details
     

 09-17-2015
3.00
Wiring clean-up and msc
Details
     

 09-01-2015
2.50
Access covers/ fairings
Details

 08-24-2015
6.00
Misc Multiple Items
Details

 08-18-2015
3.50
More Fairing work
Details

 08-17-2015
5.00
Wheel pants and fairings
Details
     

 07-31-2015
3.00
Fairings
Details
       

 07-24-2015
3.00
Throttle sub panel and fairings
Details
     

 07-14-2015
6.00
Fuel system and Throttle quad.
Details
       

 07-13-2015
4.00
Fuel leak
Details

 07-05-2015
2.00
Fuel leak and wingtips
Details

 06-26-2015
5.00
Fuel system/ seat heat/ annunciator
Details
       

 06-25-2015
2.50
Fuel leak and lighting test
Details
       

 06-19-2015
2.50
Farings and misc
Details
     

 06-18-2015
3.00
Fairings
Details

 06-16-2015
3.00
Fairings
Details
       

 06-15-2015
3.50
Rt. Fuel tank calibration
Details
       

 06-13-2015
5.00
Pitot/AoA and Throttle sub-panel
Details
       

 06-12-2015
2.50
Parking Brake Control Mount
Details

 06-11-2015
2.50
Parking Brake Control
Details

 06-10-2015
5.00
Throttle mount/ wiring/ heater testing
Details

 06-09-2015
6.00
Throttle mod and more
Details
       

 06-08-2015
6.00
Fuel tank, Control Sticks, Throttle work
Details
       

 03-18-2015
1.50
FW doubler
Details

 03-16-2015
3.00
FW penetrations
Details

 02-25-2015
2.00
Panel work
Details

 02-23-2015
3.00
Throttle Quadrant and panel work
Details

 01-31-2015
3.50
Section 46 Complete.
Details
       

 01-30-2015
5.00
Mount and FWF work
Details
       

 01-23-2015
6.00
Mount and more wiring
Details
       

 11-24-2014
2.50
Fitting Leak and Door warning switch
Details

 11-13-2014
3.00
Fuel System- testing
Details

 11-12-2014
4.00
Fuel System cont.
Details
       

 11-07-2014
1.00
Fuel System
Details

 10-27-2014
4.00
Engine mount returned
Details
       

 10-07-2014
1.50
Fairings
Details

 10-06-2014
3.00
Tips and Tires
Details
     

 10-04-2014
2.00
Left tire
Details
       

 10-03-2014
4.00
RightTire and Mount work
Details
       

 09-30-2014
3.00
Wingtip repair and more
Details
       

 09-19-2014
2.50
Fairings
Details

 09-05-2014
2.50
Light switch wiring
Details

 09-04-2014
3.00
Section 12 complete
Details
       

 09-03-2014
4.00
Emp. fairing nutplates
Details

 09-02-2014
3.00
Empennage Fairing work
Details

 08-28-2014
4.00
Empennage Fairing
Details
       

 08-27-2014
4.00
Trim and Rudder install work
Details
       

 08-22-2014
5.50
VS/ rudder install
Details
       

 08-20-2014
4.00
Wingtip lights and priming prep
Details
       

 08-19-2014
3.00
HS install, Wingtips and lights
Details
       

 08-13-2014
3.00
Misc work
Details

 08-12-2014
3.00
Fuel system and tail wiring
Details

 08-05-2014
3.00
More avionics wiring
Details

 08-01-2014
2.00
Avionics wiring
Details

 07-15-2014
3.00
Wing wiring, wingtip, and step assists
Details
       

 05-29-2014
2.50
Doors, Pins, and more
Details

 05-22-2014
2.50
interior work
Details
     

 05-21-2014
3.50
Section 45 Completed
Details
       

 05-20-2014
2.50
Door struts and locks
Details
       

 05-14-2014
2.00
Left door work
Details
       

 05-11-2014
3.00
Interior and wingtip lens
Details
     

 05-02-2014
4.00
Door prep and window work
Details
       

 04-30-2014
2.00
Interior work
Details

 04-14-2014
4.50
Cleanup, interior, and other
Details
       

 04-13-2014
2.50
Painting do over and more
Details

 04-12-2014
2.50
Interior Paint and Misc
Details
       

 04-11-2014
3.00
Final Sanding Surfacer
Details

 03-24-2014
3.00
Int. Paint prep and part priming
Details

 03-22-2014
4.00
Body work Day #2
Details
       

 03-21-2014
2.00
Body Work
Details

 03-15-2014
4.00
Body and Wingtips day #2
Details
     

 03-14-2014
4.00
Doors and Wingtips
Details
       

 03-11-2014
3.00
Body Finish work
Details
       

 03-10-2014
3.00
Wingtips and Body work Day#2
Details

 03-09-2014
3.00
Body work
Details

 02-01-2014
4.50
Body and fairing work
Details

 01-23-2014
5.00
Fairings and tanks
Details
       

 01-22-2014
4.00
Wingtips and Body work
Details

 01-06-2014
4.00
Body work and misc work
Details

 01-05-2014
2.00
Cabin Heat and cleanup
Details
       

 12-29-2013
2.00
Vent fans
Details

 12-28-2013
1.50
Interior lights
Details

 12-25-2013
2.00
Tanks and body work
Details
       

 12-19-2013
2.50
Tunnel clean up work
Details
     

 12-18-2013
3.50
Fuel system/Lights/ wing tips
Details

 12-17-2013
2.00
Tank Work #3
Details

 12-16-2013
2.00
Tank work #2
Details

 12-15-2013
2.50
Fuel System #10
Details
       

 12-14-2013
2.00
Fuel Tank Repairs
Details

 12-13-2013
3.00
Fuel system #9 and Tank work
Details
     

 12-12-2013
3.00
Fuel system day #8 and servo install
Details
       

 12-09-2013
2.50
Tank Test and Body work
Details

 12-07-2013
3.00
Fuel System #7 and Avionics
Details

 12-04-2013
3.50
Fuel system #6
Details

 11-27-2013
3.00
Fuel system #5
Details

 11-26-2013
3.00
Fuel system and door repair
Details
     

 11-25-2013
2.00
Moving Day #1
Details
       

 11-19-2013
1.50
Bag door tray
Details
     

 11-14-2013
3.00
Fuel system #4
Details

 11-03-2013
2.00
Fuel system #3
Details

 11-02-2013
5.00
Mid seat support rail repair
Details

 11-01-2013
2.00
Mid seat support rail fix + fuel system
Details

 10-29-2013
3.50
Body Work #4 and Fuel System #2
Details

 10-21-2013
3.00
Body work #3 and Fuel System
Details

 10-20-2013
2.00
Body work cont. #2
Details
       

 10-17-2013
3.00
Body work continues
Details

 10-15-2013
2.00
Air vents and body work
Details

 10-14-2013
3.00
Door and Body work
Details

 10-05-2013
1.50
Finished Section 43
Details

 10-04-2013
2.00
More Door work and aft skin install
Details

 09-27-2013
3.50
Door frames and Aft top skin install
Details

 09-26-2013
4.00
Rudder, Fuselage, and interior
Details
       

 09-25-2013
3.00
Misc Work Day #2
Details
     

 09-17-2013
1.50
Misc work
Details

 09-16-2013
4.50
Body Work- aka door rework
Details
     

 09-04-2013
3.00
Fairings Day#4
Details

 09-03-2013
3.00
Windows
Details

 09-02-2013
3.50
Fairings Day #3
Details

 08-30-2013
2.50
Fairings- Day #2
Details
       

 08-29-2013
2.00
Fairings - Windshield and Rudder
Details
       

 08-28-2013
3.50
Windshield fairing
Details
       

 08-27-2013
2.50
Windows completed and strobes
Details
     

 08-26-2013
3.00
Windows cont.
Details
       

 08-25-2013
3.50
Window install
Details

 08-24-2013
3.50
Rudder Trim work
Details
       

 08-23-2013
4.00
Rudder Trim and window prep
Details

 08-16-2013
2.00
More Rudder Trim
Details

 08-15-2013
3.50
Window prep, rudder trim, Interior lights
Details
       

 08-14-2013
4.50
Windows and wingtips
Details
       

 08-13-2013
4.00
Door, windows, seats
Details
       

 08-06-2013
3.00
Doors and rudder trim cont.
Details

 08-05-2013
4.50
Doors and rudder trim
Details
       

 08-02-2013
4.50
Doors and vents
Details
       

 07-22-2013
1.50
CO Detector and GPS Antennas
Details

 07-20-2013
1.50
Compass mount, vent fans
Details
       

 07-17-2013
8.00
Secton 41 completed, panel vents
Details
     

 07-16-2013
4.50
Fuel system, cowl hinges, brake repair, vent fans
Details
     

 06-29-2013
3.00
Cowling mount
Details

 06-28-2013
3.00
Misc plumbing
Details

 06-27-2013
3.50
Antennas and cable mounts, and more
Details

 06-26-2013
3.50
Switches/ side panels
Details

 06-24-2013
4.50
Air vent/ windscreen/ tunnel work
Details

 06-21-2013
4.50
CO Detector and Windows
Details
       

 06-05-2013
2.50
Door Warning Light install and AN-21 work
Details
     

 05-06-2013
2.50
Panel wiring prep cont.
Details
       

 05-05-2013
2.50
Panel and power bus integration
Details

 03-30-2013
5.00
Center Brace and Wiring Harness
Details
       

 03-28-2013
1.50
Center Brace install
Details

 03-27-2013
1.50
Fwd Fuselage Cleanup and Center post
Details

 03-26-2013
2.50
Fwd Fuselage Installed
Details
       

 03-20-2013
2.00
Firewall insulation
Details

 03-19-2013
2.00
Side panels and door frames
Details

 03-18-2013
3.00
Fwd Fuse. Paint and body work
Details
     

 03-15-2013
2.50
Misc. Cleanup day
Details

 03-11-2013
2.00
Electrical rework
Details

 03-10-2013
2.00
Electrical install cont.
Details

 03-08-2013
2.50
Electrical planning and install
Details

 03-06-2013
3.00
Door Frames and other misc
Details

 03-03-2013
2.00
GPU Doubler redo and Body work
Details

 03-01-2013
2.00
Cabin Body Blending
Details

 02-28-2013
5.50
Pin Block and Gas Strut Install
Details
       

 02-27-2013
4.00
Right Door Lock
Details
       

 02-27-2013
2.00
More door frame work
Details

 02-26-2013
4.50
Left Door Lock and other misc
Details
       

 02-25-2013
2.50
Elevator Tim and Aileron pushrods
Details

 02-24-2013
3.00
Avionics shelf and Fuel valve mount
Details
     

 02-11-2013
3.00
Tailcone work and misc other
Details
     

 02-08-2013
2.50
Fuel valve #3
Details

 02-07-2013
3.50
Fuel valve #2
Details
       

 02-06-2013
1.50
Fuel valve
Details

 01-24-2013
2.50
Right Door
Details

 01-23-2013
3.50
Aux battery and aft shelf
Details
       

 01-22-2013
3.50
Aft shelf and Aux Battery
Details
       

 01-19-2013
1.00
Interior and Aft Shelf work
Details
     

 01-18-2013
1.00
D10a install work
Details

 01-17-2013
3.00
Right Door
Details

 01-16-2013
4.00
More left door and electrical
Details
       

 01-15-2013
4.00
Left Door Fit and more electrical
Details
     

 01-14-2013
3.00
Elev. trim plug and New ELT mount
Details
 

 01-13-2013
2.50
Door Locks installed
Details

 01-12-2013
3.50
Instrument Panel and misc work
Details
       

 01-11-2013
3.00
Right cabin door
Details
     

 01-10-2013
3.00
Left cabin door
Details
       

 12-31-2012
1.50
Ground cables
Details
     

 12-30-2012
1.50
Electrical power cables
Details

 12-20-2012
1.50
Flaps and Shelf complete
Details

 12-19-2012
2.00
Primed Shelf parts
Details

 12-18-2012
2.00
Equipment Box shelves
Details
       

 12-13-2012
3.50
Electrical work
Details

 12-12-2012
5.00
Cabin Cover installed
Details
       

 12-10-2012
3.00
Cabin Cover prep and lights finished
Details

 12-09-2012
2.00
Priming and Prep work
Details

 12-08-2012
2.50
Battery Box and Lights
Details
     

 12-05-2012
4.00
Interior and Electrical
Details

 12-04-2012
2.50
Overhead Lights
Details
       

 11-07-2012
2.50
Brakes and Contols
Details
       

 10-25-2012
3.50
Cabin Heat and Center Console
Details
       

 10-24-2012
2.50
Control system install
Details
       

 10-23-2012
3.00
Completed brake system install
Details
       

 10-22-2012
1.50
New Internal Brake Lines
Details
       

 10-11-2012
3.00
Interior and windows
Details

 10-10-2012
3.50
Interior work
Details
     

 09-28-2012
1.50
Doors and Console again
Details

 09-27-2012
1.50
Door and Center Console
Details

 09-26-2012
1.50
Misc work
Details

 08-28-2012
2.50
Vents/ Controller/ Grd Power plug
Details
       

 08-25-2012
2.00
Still interior panels
Details
       

 08-24-2012
2.50
More interior panels
Details

 08-23-2012
5.00
Hinge covers and Interior panels cont.
Details
       

 08-22-2012
4.00
Interior panels cont.
Details

 08-21-2012
4.00
Continued fitting Aerosport Panel
Details
       

 08-20-2012
3.00
Fitting Aerosport Panels
Details
       

 08-19-2012
2.00
Installed newly painted parts
Details
       

 08-18-2012
6.00
Aux Batt mount/ Doors/ Grd. Pwr plug + painting
Details
       

 08-17-2012
4.00
Aux Battery Mount and center console
Details
       

 08-15-2012
3.50
Door Locks cont. with Misc other
Details

 08-13-2012
4.00
Door Locks
Details

 08-10-2012
4.00
Prime and install mounts
Details
       

 08-07-2012
1.50
Rosen/ Elt/ Vent valve mounts
Details

 08-01-2012
4.00
Visor Mounts and Wheel Pants
Details
       

 07-26-2012
4.00
ELT, Vent controller, and misc
Details
       

 07-20-2012
2.50
Headliner Day #3
Details
     

 07-19-2012
2.50
Headliner day #2 and main wheel fairnings
Details

 07-18-2012
2.50
Overhead liner
Details

 07-16-2012
1.50
Main Wheel Fairings
Details

 06-25-2012
4.50
Primed Cabin cover and GMU mount install
Details
       

 06-15-2012
4.00
GPU, GMU and more sanding
Details

 06-14-2012
5.50
Cabin cover, Doors and Main Fairings
Details
       

 06-13-2012
4.50
Yes, more sanding and other stuff
Details

 06-12-2012
4.50
Sanding Resumes and V/L antenna
Details
       

 06-11-2012
3.50
Misc items and GMU mount
Details

 06-06-2012
2.50
Sanding continues- UGH!
Details

 06-02-2012
3.50
Never ending sanding continues
Details
       

 06-01-2012
6.00
Cabin Cover Day #33, Doors Day #20, Fairings
Details

 05-31-2012
5.00
Cabin Cover Day #32, Doors Day #19, Tires
Details

 05-29-2012
5.00
Cabin Cover Day #31 , Doors Day #18
Details
     

 05-25-2012
4.00
Brakes/Nose gear/Wheel Pants
Details

 05-24-2012
2.50
Wheel Pants Day #7
Details
       

 05-23-2012
7.30
Wheel Pants Day #6
Details
       

 05-22-2012
2.00
Doors Day #17 and Nose wheel pant
Details

 05-19-2012
1.00
Doors Day #16
Details

 05-18-2012
6.00
Doors Day #15 , Wheel Pants Day #5
Details

 05-17-2012
5.00
Doors Day #14 and Wheel Pants Day #4
Details
       

 05-16-2012
6.00
Main wheel pants day #3
Details
       

 05-15-2012
1.00
Doors Day #13
Details

 05-12-2012
1.00
Doors Day #12
Details

 05-11-2012
5.00
Wheel Pants Day #2
Details
       

 05-10-2012
3.00
Main Wheel Pants
Details
       

 05-09-2012
2.50
Right Main/ Brakes/ Mid seat rails
Details
       

 05-03-2012
3.50
Flap Drive and Landing Gear
Details

 05-02-2012
3.00
Wheel install
Details

 05-01-2012
3.50
Flaps and Gear install
Details
 

 04-27-2012
2.00
Avionics and Electrical
Details
       

 04-26-2012
2.50
Fuel System Fabriaction Cont.
Details

 04-25-2012
1.50
Fuel system and Transponder mount
Details

 04-23-2012
2.00
Cabin Cover Day #30 and Fuel system design
Details

 04-21-2012
5.00
System Install begins.
Details
       

 04-20-2012
2.00
Interior Painting
Details
       

 04-04-2012
4.50
Cabin Cover Day #29 and brake mounts.
Details
       

 04-03-2012
4.50
Cabin Cover Day #28 and misc additional work
Details

 03-30-2012
1.50
Cabin Cover Day #27
Details

 03-29-2012
4.50
Interior Paint attempt #2
Details

 03-28-2012
5.00
Fwd Fuselage parts priming
Details
       

 03-27-2012
3.50
Cabin Cover Day #26
Details
       

 03-20-2012
1.50
Console Bonding and misc elect.
Details

 03-19-2012
2.50
Cabin cover day #25 and Doors
Details

 03-09-2012
2.50
Cabin Cover Day #24 and Doors
Details

 03-06-2012
3.00
Under panel work and cabin cover Day #23
Details

 02-01-2012
3.50
Cabin Cover Day #22 and Panel work
Details
     

 01-31-2012
4.00
Cabin Cover Day #21 and Panel cont.
Details
       

 01-30-2012
3.50
Panel support and Alternate Door attachment
Details

 01-26-2012
3.00
Forward fuselage and overhead console
Details
       

 01-25-2012
2.50
Cabin cover Day #20
Details
     

 01-24-2012
2.00
Forward Fuselage Day #3
Details

 01-23-2012
2.00
Forward Fuselage Day #2
Details

 01-21-2012
3.50
Forward Fuselage/ Panel install
Details
       

 01-20-2012
4.00
More doors day #7 and panel work
Details

 01-19-2012
4.50
Door Locks Day #6
Details
       

 01-18-2012
2.50
Primed door parts
Details
     

 01-17-2012
4.50
Locks, Door Frames and Panel supports
Details
     

 01-09-2012
2.50
Door Locks Day #4 and Panel work
Details

 12-23-2011
2.50
Door Locks Day #3
Details

 12-22-2011
2.50
Door Locks Day #2
Details
       

 12-21-2011
3.50
Continued Door Locks
Details
       

 12-14-2011
2.50
Doors Day #11 - removed and started lock
Details

 12-13-2011
2.00
Doors Day #10 - Hinges and Fitting
Details

 12-12-2011
4.00
Doors Day #9 and Hinges
Details
       

 12-09-2011
2.00
Doors Day #8
Details

 12-08-2011
3.50
Doors Day #7
Details

 12-07-2011
4.00
Door Day #6 - Hinges and Door fitting
Details
       

 11-30-2011
1.50
Door Day #5 --Hinges
Details

 11-29-2011
2.00
Door Day #4 -- Bonding
Details
       

 11-10-2011
3.50
Doors #3 and VS antenna
Details
       

 11-09-2011
0.75
Axle spacers
Details
     

 11-08-2011
3.00
Primed gear parts
Details
       

 11-07-2011
3.50
Doors #2 and Misc other items
Details
       

 11-06-2011
0.50
Main Tires
Details
     

 11-02-2011
1.50
Trimming door parts
Details
     

 11-01-2011
1.20
Doors #1
Details

 10-31-2011
2.00
Finish Kit Inventory
Details

 10-30-2011
1.00
Finsih Kit arrived
Details
       

 10-24-2011
1.50
Interior Paint
Details

 09-27-2011
1.50
Brake Pedals and Panel design
Details

 09-21-2011
2.50
Paint Prep and Panel work
Details

 09-09-2011
3.50
Insulation Complete and Paint Prep Begins
Details

 09-07-2011
3.00
Overhead Console and nose tire
Details
       

 08-29-2011
2.50
Priming parts and Controls
Details

 08-28-2011
2.50
Vents installed and panel layout
Details
       

 08-27-2011
2.00
Cabin Cover #19 and Overhead Console
Details
       

 08-25-2011
3.50
Cabin Cover day 18 + Misc.
Details
       

 08-23-2011
2.50
Brakes, Controls, Cabin Cover cont.
Details

 08-22-2011
4.50
Brakes, Controls, and Cabin Cover
Details

 08-20-2011
2.50
Brake lines
Details

 08-19-2011
4.50
Systems Installation
Details
       

 08-12-2011
2.00
Cabin Cover (still cont.)
Details

 08-11-2011
3.50
Section Clean-up and Cabin Cover cont.
Details
       

 08-08-2011
4.50
Cont, Cabin Cover Prep work
Details
       

 08-05-2011
1.50
Still Drilling Cabin Cover
Details

 08-04-2011
3.50
Drilling Cabin Cover cont.
Details
       

 08-03-2011
2.50
Fwd Fuselage and Cabin Cover cont.
Details
       

 08-02-2011
2.50
Cabin Cover and Insulation
Details

 08-01-2011
4.00
Access Covers, Rudder pedals, Flap actuators
Details
       

 07-25-2011
0.75
Control Rods
Details

 07-07-2011
2.00
Riveting Fwd Fuselage and Seat Backs
Details

 06-28-2011
0.50
Wing fairing stiffeners
Details

 06-27-2011
1.00
Dimpled+ Riveted primed parts
Details

 06-21-2011
3.50
Priming completed
Details
       

 06-20-2011
5.50
Priming parts for Sect.31/35/38/39/42/44
Details
       

 06-15-2011
3.50
Fwd Fuselage and deburring complete
Details
       

 06-14-2011
1.00
Still Deburring
Details

 06-13-2011
3.50
Cabin Cover Timming and Deburring
Details

 06-12-2011
1.50
More Deburring
Details

 06-11-2011
2.50
Rear Seat Cover and Deburring Begins
Details

 06-10-2011
0.75
Fairings
Details
       

 06-09-2011
2.50
Cabin Cover/ Controls/ Priming Prep
Details

 06-07-2011
3.00
Controls/ Brakes/ Cabin Cover cont.
Details
       

 06-06-2011
0.75
Control rods
Details

 06-05-2011
2.50
Fitting Cabin Cover
Details
       

 06-04-2011
2.50
Seat Backs Complete and Cutting Cabin Cover
Details

 06-03-2011
3.00
Seat Backs and Cabin Cover
Details
       

 05-26-2011
3.00
Finished Baggage Door and Cont. Access panels
Details
       

 05-19-2011
3.00
Baggage Areas Complete- Door Mounting Cont.
Details
       

 05-18-2011
3.00
Baggage area assembly
Details
     

 05-17-2011
3.00
Cont. Floor install
Details
       

 05-16-2011
3.00
More Floor install
Details
       

 05-15-2011
1.00
Riveting Doors and Floors
Details

 05-14-2011
3.00
Floor closeout prep
Details

 05-13-2011
0.50
Fwd top skin
Details

 05-12-2011
4.50
Primed conduit mounts and installed
Details
       

 05-11-2011
2.50
Forward fuselage work and conduits complete
Details
       

 05-10-2011
2.00
Conduit and Antenna Doublers work
Details
     

 05-08-2011
1.50
More insulation installed
Details
     

 05-06-2011
1.50
Wiring Conduit Installation
Details
     

 05-05-2011
2.00
Baggage Floor Access Complete
Details
       

 04-27-2011
2.00
More baggage access work
Details

 04-18-2011
1.50
Riveting more structures
Details
     

 04-10-2011
1.50
Doublers and step work
Details

 03-30-2011
2.00
Antenna doublers
Details
     

 03-21-2011
2.50
Floor Work
Details

 03-20-2011
2.50
Dimpling and nutplate install
Details

 03-19-2011
3.50
Fwd Fuselage riveting and more dimpling
Details
     

 03-18-2011
3.50
Priming Complete+ building resumes
Details

 03-17-2011
4.00
Priming Parts
Details
       

 03-16-2011
3.50
Completed Deburring+ Misc items
Details

 03-14-2011
2.00
Resumed Deburring
Details

 01-27-2011
1.00
More Deburring
Details

 01-24-2011
2.00
Deburring and Baggage Door work
Details

 01-21-2011
2.00
More Baggage Area work
Details
     

 01-20-2011
1.50
Baggage floors started
Details
       

 01-11-2011
3.50
Tailcone Joined!
Details
       

 01-10-2011
3.00
Final Tailcone Attachment Prep
Details
       

 01-07-2011
1.50
Upper Fwd Fuselage Assembly
Details
       

 01-04-2011
0.75
Match drill upper fwd fuselage
Details

 01-03-2011
1.00
Upper Fuselage Assembly Prep
Details

 01-02-2011
2.00
Tailcone attachment continued
Details

 12-24-2010
1.50
More Match Drilling Tailcone
Details

 12-23-2010
1.50
Match Drilling Tailcone
Details
     

 12-22-2010
2.50
Tailcone Attachment
Details
       

 12-21-2010
3.00
Riveted Fuselage rib and step work
Details
       

 12-19-2010
1.50
Misc Gear work and Step installation
Details
       

 12-18-2010
2.00
Gear Mounts Finished
Details

 12-17-2010
4.00
Fwd Floor and Gear Mounts
Details
       

 12-16-2010
2.00
Fwd floor prep
Details
       

 12-15-2010
1.00
Misc. finish items
Details

 12-13-2010
2.00
Finished Riveting Skins
Details

 12-06-2010
2.00
Riveted More Fwd Skins
Details
     

 12-04-2010
1.50
Riveted Fwd Skins
Details
     

 12-03-2010
2.00
Aft Skins Completed
Details
       

 12-02-2010
2.25
Riveted Right Skins
Details
       

 12-01-2010
2.00
Riveted Left Aft Skin
Details

 11-30-2010
2.00
Riveted Left Skins
Details
     

 11-29-2010
1.50
Clecoed skins in place
Details
     

 11-20-2010
2.50
Skin Dimpled
Details

 11-19-2010
2.00
More Structure Riveting
Details

 11-18-2010
2.00
Riveting Fwd Fuselage Channels
Details

 11-11-2010
3.00
Riveting fuselage structure
Details
       

 11-10-2010
4.00
Primed parts
Details

 11-09-2010
3.00
C-sink and deburr complete
Details

 11-08-2010
1.00
Even more C-sinking
Details

 11-05-2010
1.00
More C-sinking
Details

 11-04-2010
3.50
Deburr and C-Sink understructure
Details

 11-01-2010
1.00
More match drilling
Details

 10-25-2010
3.50
Match drilling Fwd Fuselage
Details
       

 10-24-2010
2.00
Forward Side Skins
Details
       

 10-22-2010
5.00
Left Mid Skin and Forward Structure
Details
       

 10-21-2010
3.00
Right Mid Fuselage Skin
Details
       

 10-20-2010
3.50
Longeron and baggage door seal
Details
       

 10-19-2010
6.50
Completed Section 28
Details
       

 10-08-2010
1.00
Longerons complete
Details

 10-07-2010
4.50
Fabricate Longerons
Details

 10-06-2010
2.50
More forward structure
Details
       

 10-05-2010
3.50
Riveted Fwd and Aft sections together
Details
       

 10-01-2010
3.00
Riveted Fwd Floor Structure
Details
       

 09-30-2010
4.50
Riveting fwd fuselage
Details
       

 09-29-2010
4.50
Fwd Fuselage priming complete
Details

 09-28-2010
4.00
Priming begins
Details

 09-20-2010
2.50
More Deburring
Details

 09-13-2010
4.50
C-sink and Deburr forward floor structure
Details

 09-12-2010
1.00
Disassembled fwd fuselage
Details

 09-11-2010
2.50
Joined Fwd and Aft sections
Details
       

 09-03-2010
3.50
Finished Sect 27 and More Fwd Fuselage
Details
       

 09-02-2010
5.00
Bottom skin work-- Front and Rear
Details
       

 09-01-2010
5.50
Firewall riveting and Fwd Fuse Bulkheads
Details
       

 08-31-2010
2.50
Fwd Fuselage Bulkhead Assembly
Details
       

 08-30-2010
2.00
Final prep for riveting Sect 26 + 27
Details
       

 08-29-2010
1.00
Rib riveting finished
Details

 08-28-2010
1.50
More Rib Riveting
Details
       

 08-27-2010
4.00
Cont. Mid Fuse Riveting and started Firewall
Details
       

 08-26-2010
5.00
More Mid Fuselage Riveting
Details
       

 08-25-2010
3.50
Mid Fusealge Riveting
Details
       

 08-24-2010
8.50
Mid Fuse Ribs and Firewall Priming Complete
Details
       

 08-23-2010
5.00
Priming Mid Fuse Ribs and Firewall parts
Details
     

 08-17-2010
0.50
Deburring complete
Details

 08-16-2010
5.00
Drilled and Deburred Firewall
Details
       

 08-15-2010
2.00
Deburring ribs and Started Firewall
Details
       

 08-14-2010
5.50
Mid Fuselage Ribs
Details

 08-13-2010
3.00
Disassembled Mid Fuselage ribs
Details

 08-12-2010
2.25
More Mid Fuse Ribs
Details
       

 08-11-2010
4.50
Bulkheads and Mid Fuselage Ribs
Details
       

 08-04-2010
2.50
Bulkhead riveting
Details
       

 08-03-2010
4.00
Bulkheads primed, assembly begins
Details
       

 08-02-2010
3.00
Priming Fuselage bulkheads
Details

 08-01-2010
2.00
Fuselage bulkhead deburring
Details

 07-31-2010
4.50
Match drilling and deburring fuselage bulkheads
Details

 07-20-2010
1.50
Aft Center Section and Rear Spar Bulkhead
Details
       

 07-14-2010
1.00
Fwd Center Section Assembly
Details
     

 05-13-2010
3.00
Inventory
Details

 05-12-2010
1.00
Unpacking fuselage crate
Details
       

 05-07-2010
0.50
Fuselage Kit arrives!
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.