Powered By Kitlog Pro v2.0
Flandy Rv-10
RV-10
Empennage
8-13-2008
< Previous Log Entry
Next Log Entry >
Date:
8-13-2008
Number of Hours:
2.50
Manual Reference:
10-7
Brief Description:
Assembled frames, bulkheads, and skins
Step 1 Assembled frames F1007/1008 and 1010 to F1078.
Step 2 Placed F1047F stiffeners in place. Match drilled to #40.
Step 3 Placed F1047G in place and match drilled
Step 4 Clecoed bellcrank ribs in place and final drilled #30 holes per plans.
Step 5 Moved assembly to left.
Step 6 Clecoed F1073R side skins in place.
Step 7 Started match drilling stiffeners to skin to #40.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
1174
3570
Avionics
105
330
Empennage
143
284
Engine
205
918
Fuselage
475
1411
Miscellaneous
11
48
Wings
235
579
Copyright © 2001-2024 Matronics. All Rights Reserved.