KitLog pro

Powered By Kitlog Pro v2.0

Flandy Rv-10
' style=
Date:  8-12-2008
Number of Hours:  3.50
Manual Reference:  10-3 and 10-4
Brief Description:  Bulkhead and Frame preparation

Step 3 Drew mark 1/4" from edge of F1011A. Centered on F1011 with line visible through holes and clamped in place. Match drilled.

Step 4 Step drilled marked hole to 5/8".

Step 5 Repeated step 3 for locating and drilling F1011E to F1011 bulkhead.

10-4

Step 1 Fabricated HS attachment angle from stock.
Step 2 Seperated bulkhead doubler
Step 3 Deburred F1010 bulkhead and clecoed doublers in place
Step 4 Placed F1010A on bulkhead 1/8" above top flange of bulkhead. Clamped in place.
Match drilled top 13 holes with #30.
Step 5 Final drilled #30 remaining common holes of bulkhead and doublers.
Step 6 Deburred F1008 L+R frames. Clecoed together with F1085 rudder cable bracket.
Final drilled common holes #30.
Step 7 Deburred F1007 L+R. Clecoed together and final drilled #30 common holes
Step 8 Step drilled number 3/16" holes to 5/8".
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.