Powered By Kitlog Pro v2.0
Flandy Rv-10
RV-10
Empennage
8-9-2008
< Previous Log Entry
Next Log Entry >
Date:
8-9-2008
Number of Hours:
1.40
Manual Reference:
10-2 and 10-3
Brief Description:
Rudder cable angle and HS attachment bars
10-2
Step 5 Machine C'sink 1011e for flush rivets on nutplates.
Step 6 Cut bulkhead stiffener to length from stock
10-3
Step 1 Straightened HS attachment bars (1011C) and deburred.
Step 2 Clecoed to Bars to F-1011 bulkhead and match drilled #30 all common holes except
the two common to F-1011a stiffener.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
1174
3570
Avionics
105
330
Empennage
143
284
Engine
205
918
Fuselage
475
1411
Miscellaneous
11
48
Wings
235
579
Copyright © 2001-2024 Matronics. All Rights Reserved.