Powered By Kitlog Pro v2.0
Flandy Rv-10
RV-10
Empennage
8-7-2008
< Previous Log Entry
Next Log Entry >
Date:
8-7-2008
Number of Hours:
1.00
Manual Reference:
10-2
Brief Description:
Tie down and aft bulkhead
Step 1 Cut tie down bar from stock- will tap later
Step 2 Deburred F1012a+b bulkheads and clecod together.
Step 3 Marked tie down bar per plans and clamped to bulkheads. Matche drilled #30 holes first and clecoed. Then match drilled 3/16 " holes.
Step 4 Cut F1011e from stock and drilled #12 holes per plans.
Step 5 Match drilled holes for nutplates.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
1174
3570
Avionics
105
330
Empennage
143
284
Engine
205
918
Fuselage
475
1411
Miscellaneous
11
48
Wings
235
579
Copyright © 2001-2024 Matronics. All Rights Reserved.