KitLog pro

Powered By Kitlog Pro v2.0

Flandy Rv-10
' style=
Date:  8-13-2008
Number of Hours:  3.00
Manual Reference:  10-5 thru 10-6
Brief Description:  Frames/stiffeners/longerons

10-5

Step 1 Deburred and clecoed F1006A+B+C+D. Drilled only A+C+D common holes to #30.

Step 2 Cut 12 J-channels to lengths per plans and marked.

Step 3 Trimmed ends to 45 degree and deburred.

Step 4 Marked rivet hole centerline to 5/16" and end mark 3/16" on each stiffener.


10-6

Step 1 Trimmed longerons to 98 1/8" Marked 20 11/16 and 7 7/16" Marked 15/32" and drilled
pilot hole to #40 and final drilled 1/4". Removed material per plans and finished smooth.

Step 2+3 Bent longerons per plans instruction.


NOTE: Discovered holes drilled in wrong location on 8/14. Both longerons to be redone from new stock.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.