Powered By Kitlog Pro v2.0
Steves S-20 Build Site.
S-20 Raven
All
3-12-2016
< Previous Log Entry
Next Log Entry >
Date:
3-12-2016
Number of Hours:
8.00
Manual Reference:
Brief Description:
Tapes over the rib bottoms.
Put the tapes over the bottom ribs.
* Basically a repeat of the top rib tapes procedure.
Rib Tapes.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
S-20 Raven Home
Category
# Logs
# Hours
All
197
1269
Avionics
10
79
Covering
41
384
Empennage
1
5
Engine
4
11
Fuselage
55
225
Miscellaneous
26
156
Painting
27
268
Prop
1
2
Wings
32
139
Copyright © 2001-2024 Matronics. All Rights Reserved.