Steves S-20 Build Site.
' style=
Date:  7-27-2015
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Install Tanks and Lower Root Skins.

Installed the fuel tanks, lower sight gauge fuel line, riveted ribs #1 and #2 in place, and riveted the lower root skin in place.

Comments:

* This all went together without much effort. The only comment I would make is to leave the root rib and rib #2 clekoed in place until this point in the build as they need to be moved out the way to easily access the fuel tank bolts. I also needed to rotate the root rib around to find the magic spot that allowed the upper sight gauge fitting I used to slip through the provided hole.
' style=

Installing the tank.

Installing the tank.

' style=

Fuel gauge fittings.

Fuel gauge fittings.

' style=

Lower root skin riveted in place.

Lower root skin riveted in place.