Brief Description: Install Tanks and Lower Root Skins.
Installed the fuel tanks, lower sight gauge fuel line, riveted ribs #1 and #2 in place, and riveted the lower root skin in place.
Comments:
* This all went together without much effort. The only comment I would make is to leave the root rib and rib #2 clekoed in place until this point in the build as they need to be moved out the way to easily access the fuel tank bolts. I also needed to rotate the root rib around to find the magic spot that allowed the upper sight gauge fitting I used to slip through the provided hole.