Time to organize the cockpit. I installed the Throttle and Mixture cables to the Quadrant mounting bracket. Adjusted the length of the cables to the carburator, and installed the required hardware. Checked the Throttle and Mixture throws, and adjusted as necessary. I fabricated (2) cover plates for the sides of the Throttle quadrant, they will be installed during final assembly.