KitLog pro

Powered By Kitlog Pro v2.0

My RV-10
' style=
Date:  10-28-2013
Number of Hours:  0.00
Manual Reference:  
Brief Description:  Hanger Prep

Just a quick note...

Preping the hanger... I have the office framed up.
The roof is also on, not pictured here. I need to inslutate and put on the siding.
The hanger is 36ft deep, so that leaves me 28ft for the plane, tail to nose.
To the right of the office is the parking area for the golf cart.

I will equip the office with A/C and refrigerator. The hanger can get very hot in the summer time.
Just want a cool place to relax. I plan to move the plane to the hanger at the first of December.
' style=

Framed up

Framed up

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.