KitLog pro

Powered By Kitlog Pro v2.0

My RV-10
' style=
Date:  2-22-2014
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Fueslage / Empennage

Finished dressing up the empennage tips... Checked clearances.
Installed the pitot tube, connected the Angle of Attack (AOA) and Airpeed (AS) tubing.
Terminated the Static/AOA/AS tubing to the ADHARS unit in the aft avionics bay.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.