KitLog pro

Powered By Kitlog Pro v2.0

My RV-10
' style=
Date:  12-26-2013
Number of Hours:  1.50
Manual Reference:  
Brief Description:  ELT / Empenage

Installed the ELT in it's permenant location... aft location in the empenage.
I have the vetical and horizontal stabilizers in place and ready to be permenantly installed.
I want to have most of the final assemby complete, wings, empenage, control surfaces, etc... before the first engine starts.
' style=

ELT Location

ELT Location

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.