KitLog pro

Powered By Kitlog Pro v2.0

My RV-10
' style=
Date:  1-31-2013
Number of Hours:  1.50
Manual Reference:  Sec 9 DWG 41
Brief Description:  Canopy Tracks

Installed the canopy tracks, with the AN515-8R8 as required.
Installed the canopy frame checked the operations, along with the latching handle.
It looks like I am ready to start cutting on the canopy glass...

Please Note:

Dynon has responded to many of the QA issues... I know they will make things right.
Take a look at the Dynon Post... especially the comments of the new President of Dynon.

http://dynonavionics.com/cgi-bin/yabb2/YaBB.pl?num=1359522057
' style=

Rails Primed and Bolted in...

Rails Primed and Bolted in...

' style=

Latch Working Well...

Latch Working Well...

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.