KitLog pro

Powered By Kitlog Pro v2.0

My RV-10
' style=
Date:  4-20-2012
Number of Hours:  2.00
Manual Reference:  Sec 8 DWG 33
Brief Description:  Flap Mounting

Airport had the AN4-16 bolt that is required.
Fitted, deburred and primed all associated parts.
Assembled the Flap mounting hardware.
Temporarily installed the flap motor, and installed it in the aircraft.
' style=

Flap Motor

Flap Motor

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.