KitLog pro

Powered By Kitlog Pro v2.0

My RV-10
' style=
Date:  3-26-2012
Number of Hours:  5.00
Manual Reference:  Sec 8 DWG 26
Brief Description:  Aft Fuselage

Fitted the shoulder harness anchor left and right.
Drilled, deburred and primed.
Fitted the F-656 L&R plates, drilled, deburred and primed.
Riveted the gusset plates in place.
Riveted the vertical channel to the F-706 bulkhead.
Fabricated the F-635 Bellcrank, drilled the VA-146 flange bearing.
Deburred and primed all the associated parts. Riveted the assembly.
Fabricated the F-635C spacers, and temporarily installed the bellcrank.
Cleco'd the aft top skin in place.
' style=

F-635 Bellcrank

F-635 Bellcrank

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.