KitLog pro

Powered By Kitlog Pro v2.0

My RV-10
' style=
Date:  12-6-2011
Number of Hours:  1.00
Manual Reference:  Sec 8
Brief Description:  Left Fuselage Step

Riveted the left step...
Started final fitting on the right baggage side panels and floor.
I was looking closely to see if I could just rivet them in place, since the only thing that goes through this area is the rudder cable, I am sure I can string it through when it is time.
I just wanted to get all the nutplates in place for the flap access panel.
' style=

Left Step Riveted

Left Step Riveted

' style=

Right Side / Floor panels

Right Side / Floor panels

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.