KitLog pro

Powered By Kitlog Pro v2.0

My RV-10
' style=
Date:  10-24-2009
Number of Hours:  2.50
Manual Reference:  
Brief Description:  Tie Down Assemblies

Fabricated the tie down assemblies spacers
Matched drilled to spar and and drilled for nut plates.

Still not finding much time to work in the shop lately.

I did go flying over the weekend... C172 G1000 with the synthetic vision.
I really like the new technology, but being from the old school of flying, kind of takes the fun out of it. I shot a GPS 11 LPV approach into KGIF (Winter Haven, FL) and flew the published missed without really having to think about anything... is that good? I personally enjoy the planning part of flying. That was hands on... the second was flown with the autopilot, which I believe is a Pilot's best friend and should be used in any single pilot IFR operation. Again I enjoyed... but as an instructor I really think students today should learn basics before transistioning into these planes.

Humble opinion...
' style=

Tie Downs

Tie Downs

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.