KitLog pro

Powered By Kitlog Pro v2.0

My RV-10
' style=
Date:  7-11-2010
Number of Hours:  4.00
Manual Reference:  Sec 7-7 DWG 15A
Brief Description:  Leading to Spar

FItted the leading and fuel tank, leveled and squared the wing.
Riveted the leading edge to the spar, using the folding hand technique.
Had an issue with a couple of rivets and had to drill them out.
I was not going to take an chances, so I had to MSP -44 / 43 Monel Cherry rivets per Van's.
I just could not get my hand in the right position to feel confident, and did not want to mess up the spare.

everything lined up nicely and the leading edge is complete and installed on the spar.
' style=

Top Right Leading Edge

Top Right Leading Edge

' style=

Bottom Right Leading Edge

Bottom Right Leading Edge

' style=

Leading to Spar

Leading to Spar

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.