KitLog pro

Powered By Kitlog Pro v2.0

My RV-10
< Previous Log Entry          Next Log Entry >
' style=
Date:  3-20-2014
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Prep for First Flight

Checked all bellcranks and linkages, lubricated as required.
Installed inspection Panels.
Armed the ELT. Tested.
Installed empennage transition fairings.
Checked timing on Emags.
Hooked up tricke charger.

March 21st:
Install cowling
Engine start / run-up
High-speed taxi / ground runs / ground handling / Brakes
Airspeed checks
Check for fuel / oil leaks etc.

March 22nd:
If everything looks good from the ground runs.
First Flight
' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.