KitLog pro

Powered By Kitlog Pro v2.0

My RV-10
' style=
Date:  8-12-2009
Number of Hours:  0.50
Manual Reference:  Sec 6-7 DRW 7
Brief Description:  Rudder Trailing Edge

Duty called... We are upgrading 600 servers at work, and migrating the data doesn't always go so smoothly, so I did not get much shop time or sleep for that matter.

I did manage to stop by the local hardware store and pick up (2) 1/8" x 1" x 4' aluminum angle stock. I drilled matching holes in both pieces and cleco'd the trailing edge.

The reason I wanted to use 2 pieces of angle was to have equal clamping pressure and each side of the trailing edge. As for now it is just clamped in place for final riveting of the skin to the skeleton. When that is complete I will continue with bonding and riveting of the trailing edge.

It is very straight at this point... c(-;
' style=

Cleco'd Trailer Edge

Cleco'd Trailer Edge

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.