Checked all bellcranks and linkages, lubricated as required. Installed inspection Panels. Armed the ELT. Tested. Installed empennage transition fairings. Checked timing on Emags. Hooked up tricke charger.
March 21st: Install cowling Engine start / run-up High-speed taxi / ground runs / ground handling / Brakes Airspeed checks Check for fuel / oil leaks etc.
March 22nd: If everything looks good from the ground runs. First Flight