Continued work on the cowling. Adjusted the carb heat control arm to clear the lower cowling. Completed the hinge pins that hold the upper and lower cowling along the sides. Fabricated the hold downs for the hinge pins, installed nutplates and riveted in place. Temporarily installed the gap seals between the wings and fuselage. matched drilled. Drilled the holes for the gasolators in the wing roots.