KitLog pro

Powered By Kitlog Pro v2.0

My RV-10
' style=
Date:  12-28-2013
Number of Hours:  2.50
Manual Reference:  Sec 8 DWG 38/45
Brief Description:  Complete Wing Mounts / Fuel / Vent Lines

Completed the final drilling and deburring of the wing mount points.
Installed required hardware and torqued as required.

Fabricated the fuel lines that run from the tank to the gasolator installed in each wing root.
Fabricated the fuel vent lines that run from the tank to the fuselage vent lines.

Sealed and installed fuel drains in each tank.
' style=

Aft Wing Mount Point

Aft Wing Mount Point

' style=

Fuel / Vent Lines

Fuel / Vent Lines

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.