KitLog pro

Powered By Kitlog Pro v2.0

My RV-10
' style=
Date:  11-11-2012
Number of Hours:  6.50
Manual Reference:  
Brief Description:  Carb Air Intake Box

AirBox is a bigger job than I imagined... I logged about 12 hours over the last 2 days.

Fabricated the carb heat door, cut the airbox to shape. Installed the hinge / hinge arm.
Installed the carb heat cable, cut to length, and tested operation.
Installed the carb heat intake to crossover exhaust, and mounted the heat intake tube to airbox.
I need to get some 2" scat tubing to complete the assembly.

Cut the bottom of the air box for the alternate air intake, drilled / sealed and mounted the flange.
Fit the alt air door, installed the control cable in the cockpit, and cut to length.
' style=

Carb Heat Door

Carb Heat Door

' style=

Alt Air Intake

Alt Air Intake

' style=



"RED" Alt Air Control Cable

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.