KitLog pro

Powered By Kitlog Pro v2.0

My RV-10
' style=
Date:  8-19-2012
Number of Hours:  2.50
Manual Reference:  
Brief Description:  Pressure Line / Electrical

Installed the oil pressure line, fit perfectly.
Setup the connections for the manifold pressure.
Ran / Secured the electrical connections for the alternator and EGT/CHT cylinders 1 &3.
' style=

Oil Pressure Line

Oil Pressure Line

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.