KitLog pro

Powered By Kitlog Pro v2.0

My RV-10
' style=
Date:  7-7-2012
Number of Hours:  2.50
Manual Reference:  Sec 8 DWG 27A
Brief Description:  Vert. Stab / Rudder

Finished the final fitting of the Vert. Stab.
Fitted the tie down mount and drilled the vert stab to the aft bulkhead.
Bolted the Vert Stab in place temporarity. check the demensions, everything checkout great.
Mounted the Rudder to check fit and travel.
I have a couple other holes to drill on the Horizontal Stab front spar and F-798 shims.
Fitted the empennage fairing, which surprisingly fit like a glove... I trimmed to clear the elevator control arm, and the rest just snuggled right into place. No apprecible gaps to speak of...
' style=

Forward Spars

Forward Spars

' style=

Empennage in Place

Empennage in Place

' style=

Empennage Fairing

Empennage Fairing

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.