KitLog pro

Powered By Kitlog Pro v2.0

My RV-10
' style=
Date:  3-28-2012
Number of Hours:  3.00
Manual Reference:  Sec 8
Brief Description:  Aft Fuselage / Static System

Deburred the bulkheads / Dimpled.
Fitted the static ports and tubing.
Tapped up the static ports and pulled a 10" vacuum on the system and then went in to get something to eat, when I came out no leaks in the system detected.
' style=

Static Ports / Lines

Static Ports / Lines

' style=

Static Line to Avionics Bay

Static Line to Avionics Bay

' style=

Vacuum / Leak Test

Vacuum / Leak Test

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.