Assembled the left case components. Installed new main bearings, marked front main bearing. Pre-lubricated all surfaces. Installed crankshaft in left case. Pre-lubricated lifters. Just placed the cam in left case to measure clearances. Checked front trust face clearances, all are within new limits.
Just wanted to show the STC "Ney" Nozzles in pic 2 and 3. These nozzles are designed to spray oil directly on the cam lubes... Nice to know pressurized oil will be concentrated on the cam...