KitLog pro

Powered By Kitlog Pro v2.0

My RV-10
' style=
Date:  6-13-2011
Number of Hours:  1.50
Manual Reference:  Sec 8 DWG 21
Brief Description:  F-711 Bulkhead

Continued to debur the bulkheads
Began the fitting of the F-711 bulkhead by removing the required material per DWG 21.
Cleco'd together to verify fit.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.