KitLog pro

Powered By Kitlog Pro v2.0

My RV-10
' style=
Date:  4-25-2010
Number of Hours:  1.50
Manual Reference:  Sec 7-6 DWG 16A
Brief Description:  Flop Tube Setup

Fabricated the anti-Hang bracket for flop tube and revited in place.
Installed the Grommets for the vent tube.
Sized and fitted the vent tube for final cutting.
Cut the 18 AWG wire for the fuel sending plates / crimped wire connectors in place.
Final fitting of the rear baffle completed.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.