KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log
' style=
Date:  10-1-2009
Number of Hours:  0.10
Manual Reference:  
Brief Description:  Vertical F-728 Vertical Rib

Next the plan address this F-728 vertical rib. But I already did all this work previously and I still don't know why the plan delays it until now. I've had no problems with the angle riveted to the rib and to the bottom skin. I did previously prepare the other holes in the bulkhead for the top rib that goes aft.
' style=

F-728 rib already riveted in place

F-728 rib already riveted in place

' style=

Angle is on and riveted to bulkhead

Angle is on and riveted to bulkhead

' style=

I riveted to bottom skin earlier

I riveted to bottom skin earlier

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.