KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log
' style=
Date:  10-2-2009
Number of Hours:  0.10
Manual Reference:  
Brief Description:  Elevator Bell Crank

Next per plan is building up the elevator bell crank. But I already did this earlier too. I did it while the aft fuselage was open in front so I could easily reach this area of the airplane. At that previous time I installed the Dynon servo bracket, built this bell crank, and drilled the hole for the servo push rod. Spacers and everything are done.

So moving on . . .
' style=

Bell crank built earlier

Bell crank built earlier

' style=

Complete and set aside for now

Complete and set aside for now

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.