Next per plan is building up the elevator bell crank. But I already did this earlier too. I did it while the aft fuselage was open in front so I could easily reach this area of the airplane. At that previous time I installed the Dynon servo bracket, built this bell crank, and drilled the hole for the servo push rod. Spacers and everything are done.