KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log

Builder:
Steven Lynn
Location:
Anacortes, WA - USA
Aircraft:
Vans - RV-7A
Manufacturer:   
http://www.vansaircraft.com/
Engine:
Lycoming - IO-360
Prop:
-
Total Build Time:
1711 Hours

Welcome to Steve's RV-7A construction log for a Vans RV-7A experimental airplane. This website documents the construction. I'm documenting the assembly and mostly following the sequence in Van's plans. It helps me remember what I did and I hope other builders find some assistance from the experiences written up in this log. And friends, family, pilots and other interested folks can see how it's going.

Your emails are welcome and your interest is appreciated.

Recent Activity
 Date Hours Work Log Summary Details
 09-07-2019
1.0
Phase 1 Complete 3
       

 09-07-2019
1.0
Phase 1 Complete 2 WAAAM
       

 09-01-2019
3.0
Phase 1 Complete 1
Details
       

 05-18-2019
1.0
Flight 9 To Skagit
Details
     

 05-18-2019
2.0
10 Hour Inspection 2
Details
       

 05-18-2019
2.0
10 Hour Inspection 1
Details
       

 05-10-2019
1.0
Engine Readings 4
Details
       

 05-10-2019
1.0
Engine Readings 3
Details
       

 04-17-2019
0.5
Tool Box For Second Hangar
Details
     

 04-03-2019
0.5
Engine Readings 2
Details
       










Copyright © 2001-2019 Matronics. All Rights Reserved.