KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log
' style=
Date:  4-4-2010
Number of Hours:  0.50
Manual Reference:  
Brief Description:  Fuselage Final Items: Electric Aileron Trim 3

The bracket gets trimmed in length and two holes match drilled to the floor using existing floor holes.

Then you remove the two platenuts previously put on the two center floor ribs. Platenuts on the bracket will be used instead.

Then two additional holes get drilled in the bracket and floor ribs 1 1/32 below the existing holes. These will be dimpled and hidden under the floor.
' style=

Match drill these two holes

Match drill these two holes

' style=

Remove platenuts

Remove platenuts

' style=

Drill two new holes

Drill two new holes

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.