KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log
' style=
Date:  10-6-2008
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Tank Prep - Left Tank Assembly 1st Clecoe

I assembled the left tank today; match drilled it, and put it on the wing. I again put the first row of clecos on with the skin outside of the cradle because this allows the nose of the ribs to get right up against the skin without any trouble. Then after I have the first couple rows of clocoes on, I put it in the cradle to finish. Finally I put it on the wing. Tomorrow I'll drill the z-brackets for final location of this tank.
' style=

Initial clecoes  put on outside of cradle

Initial clecoes put on outside of cradle

' style=

Cradle used to finish the clecos

Cradle used to finish the clecos

' style=

Positioning Tank on Wing

Positioning Tank on Wing

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.