KitLog pro

Powered By Kitlog Pro v2.0

Sid & Houston Mayeux Project
' style=
Date:  11-25-2011
Number of Hours:  2.00
Manual Reference:  Vert Stab
Brief Description:  Rear tie-down block, vert stabilizer (part 2)

With the aft spar drilled to the tie-down block's hole pattern, I remounted the vertical stab to the aircraft and matchdrilled the aft bulkhead to the aft spar. I marked the holes (image 2) to be sure I didn't accidently drill the rivet holes to 3/16".

I dimpled the aft bulkhead's rivet holes with a pull-rivet dimple set, and countersunk the tie-down block's rivet holes to accept these dimples. I then riveted the tie-down block to the aft bulkhead with AN 427-4 rivets, facing the flush head rearward to lie underneath the vertical spar's aft spar.
' style=

Match-drilling aft bulkhead to aft spar's pilot holes

Match-drilling aft bulkhead to aft spar's pilot holes

' style=

Aft bulkhead drilled, marked (Rivets vs Bolts)

Aft bulkhead drilled, marked (Rivets vs Bolts)

' style=

Tie-down block riveted in place to aft bulkhead

Tie-down block riveted in place to aft bulkhead

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.