KitLog pro

Powered By Kitlog Pro v2.0

Sid & Houston Mayeux Project
' style=
Date:  11-25-2011
Number of Hours:  2.00
Manual Reference:  Vert stab
Brief Description:  Rear tie-down block, vert stabilizer

I constructed the tail tie-down block, took careful measurements of it's position in relation to the bottom of the fuselage, then clamped it into place on the vertical stab's aft spar and match-drilled pilot holes in #30. I then primed the block and drilled the hole in the fuselage bottom through which the tie-down bolt will pass.
' style=

Drilling pilot holes from tie-down block to vert stab aft spar

Drilling pilot holes from tie-down block to vert stab aft spar

' style=

Primer

Primer

' style=

Drilling the tie-down ring bolt's pass-through hole through the fuselage

Drilling the tie-down ring bolt's pass-through hole through the fuselage

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.