KitLog pro

Powered By Kitlog Pro v2.0

James Roberts RV8 Build
< Previous Log Entry          Next Log Entry >
' style=
Date:  4-18-2020
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Starting vertical stabiliser

I can't complete the horizontal stabiliser until the longeron yoke for the squeezer arrived but it is allegedly in transit somewhere over the ocean at the minute! So with every other non conflicting step complete I moved onto the vertical stabiliser.

Made scary speed of progress today with the VS ribs all fluted, edge treated 90 degreed then assembled with the connecting points with a 30 drill and then clecoed on the skin. Enough for one day and will drill to size the 40 holes in the skin tomorrow hopefully.
' style=





' style=




' style=




' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.