KitLog pro

Powered By Kitlog Pro v2.0

James Roberts Zodiac XL Build
21 Logs Found 
 Date
Hours
Work Log Summary

Details

 10-22-2011
3.0
Riveting of top rear fuselage skin
Details

 10-15-2011
4.0
Painting of inside of top fuselage skin
Details
       

 07-27-2011
5.0
Painting of baggage shelf etc
Details
       

 07-19-2011
4.0
Upper right longeron and splice
Details
       

 07-16-2011
4.0
Rear bulkhead painting
Details
       

 07-02-2011
4.0
Left hand upper splice and longeron
Details
       

 05-10-2010
4.0
Installing bulkhead skin
Details
       

 02-23-2010
8.0
Final riveting of rear fuselage
Details
       

 01-03-2010
5.0
Installing baggage shelf braces
       

 08-15-2009
3.0
Installation of seat backs
       

 08-15-2009
5.0
Baggage Shelf
       

 07-04-2009
4.0
Installation of bulkheads
       

 06-21-2009
5.0
Installation of Rear Carry Through Spar
Details
       

 09-07-2008
3.0
Constructing Fuselage Access Hatch
Details
       

 08-17-2008
5.0
Lazer Alignment of Fuselage
Details
       

 08-15-2008
2.0
Rudder hinge assembly
Details
       

 08-03-2008
4.0
Corrosion proofing and final riveting of rear fuse
Details
       

 08-02-2008
5.0
Corrosion proofing and final riveting of rear fuse
Details
       

 07-28-2008
16.0
Installation of the rear fuselage side skins (cont
Details
       

 07-21-2008
7.0
Horizontal Tail Frame
Details
       

 07-02-2008
7.0
Constructing the rear fuselage floor
Details
       











Copyright © 2001-2013 Matronics. All Rights Reserved.