Powered By Kitlog Pro v2.0
James Roberts Zodiac XL Build
Zodiac XLB/650B
Rear Fuselage
21 Logs Found
Date
Hours
Work Log Summary
Details
10-22-2011
3.0
Riveting of top rear fuselage skin
Details
10-15-2011
4.0
Painting of inside of top fuselage skin
Details
07-27-2011
5.0
Painting of baggage shelf etc
Details
07-19-2011
4.0
Upper right longeron and splice
Details
07-16-2011
4.0
Rear bulkhead painting
Details
07-02-2011
4.0
Left hand upper splice and longeron
Details
05-10-2010
4.0
Installing bulkhead skin
Details
02-23-2010
8.0
Final riveting of rear fuselage
Details
01-03-2010
5.0
Installing baggage shelf braces
08-15-2009
3.0
Installation of seat backs
08-15-2009
5.0
Baggage Shelf
07-04-2009
4.0
Installation of bulkheads
06-21-2009
5.0
Installation of Rear Carry Through Spar
Details
09-07-2008
3.0
Constructing Fuselage Access Hatch
Details
08-17-2008
5.0
Lazer Alignment of Fuselage
Details
08-15-2008
2.0
Rudder hinge assembly
Details
08-03-2008
4.0
Corrosion proofing and final riveting of rear fuse
Details
08-02-2008
5.0
Corrosion proofing and final riveting of rear fuse
Details
07-28-2008
16.0
Installation of the rear fuselage side skins (cont
Details
07-21-2008
7.0
Horizontal Tail Frame
Details
07-02-2008
7.0
Constructing the rear fuselage floor
Details
SITE NAVIGATION
Contact Builder
Zodiac XLB/650B Home
All
Avionics
Canopy
Elevator
Flight Controls
Forward Fuselage
Horizontal Stabilize
Miscellaneous
Prop
Rear Fuselage
Rudder
Undercarriage
Upgrade
Copyright © 2001-2013 Matronics. All Rights Reserved.