KitLog pro

Powered By Kitlog Pro v2.0

Jims Web Site
' style=
Date:  2-10-2011
Number of Hours:  1.70
Manual Reference:  6ZU1
Brief Description:  Prepared installation of Wing Root Doubler

1. Removed vertical mounting rivets on wing ribs 2 and 3.
2. Clamped wing root doubler 6ZU1-2 into position.
3. Back drilled existing holes in spar through doubler with 3/16, 1/4 and 5/16 bits, respectively.
4. Holes had bolts placed in them to aid aligment as they were added.
5. Removed bolts and clamps.
6. Removed 6ZU1-2. Cleaned and primed back surface.
' style=

Backdrilling

Backdrilling

' style=

priming

priming

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.