KitLog pro

Powered By Kitlog Pro v2.0

Jims Web Site
' style=
Date:  1-20-2011
Number of Hours:  2.10
Manual Reference:  6ZU3
Brief Description:  Replaced bellcrank mount

This is a very cold day, so not much got done.

1. Drilled out rivets holding 6W6-10 in place, along with bellcrank supports.
2. Cleaned holes.
3. Used 6W6-10 as drilling template for 6ZU3-1, bell;crank support channel.
4. Drilled holes in 6ZU3-1.
5. Deburred holes.
6. Trimmed top and bottom of 6ZU3-1 to fit, filed and deburred.
7. Primed back of 6ZU3-1, and allowed to cure.
8. Clecoed 6ZU3-1 and bellcrank supports in place.
9. Riveted 6ZU3-1 and bellcrank supports in place, using A5 rivets.
' style=

Removed 6W6-10

Removed 6W6-10

' style=

6ZU3-1 clecoed in place

6ZU3-1 clecoed in place

' style=

Reverse side

Reverse side

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.