Brief Description: Join front and rear floors with gear channel
1. Positioned gear channel 6B5-5 over front and rear fuselage halves. 2. Placed clecoes in alternate rivet holes. 3. Pulled A5 rivets in alternate holes. 4. Removed clecoes. 5. Pulled remaining rivets, except those in the last holes on the outside, which may have something connected later.