Brief Description: Attached baggage floor to upper channel
1. Placed baggage floor in position over side supports, side to side stiffners, and newly added upper channel 6B5-3. 2. Located center of upper channel, and drilled #40 pilot holes in either end, and in the center. 3. Marked pitch 40mm locations for rivets between baggage floor and upper channel. 4. Drilled and clecoed rivet holes with #40 bit. 5. Opened holes with #30 bit for A4 rivets, and clecoed.