KitLog pro

Powered By Kitlog Pro v2.0

Jims Web Site
' style=
Date:  9-21-2009
Number of Hours:  2.00
Manual Reference:  6B16
Brief Description:  Worked on baggage floor support installation

1. Positioned drilled "L" angles spanning baggage floor in fuslage.
2. Clamped in place.
3. Checked aircraft with laser for straight and true.
4. Positioned baggage floor over "L" angles.
5. Clamped floor in place.
6. Checked straight and true with laser.
7. Back drilled key holes in baggage floor through "L" angles with #40 bit.
8. Removed floor and angles.
9. Clecoed angles to floor on bench.
10. Back drilled remaining holes.
11. Removed side "L" angle supports for baggage floor from fuselage.
12. Marked end rivet holes on top of the angles, punched, and drilled with #40 bit.
13. Set intermediate holes to pitch 40mm with rivet fan.
14. Punched and drilled with #40 bit.
15. Reinstalled side "L" angles.
16. Reinstalled side-to-side baggage floor support angles.
' style=

Back drilling side-to-side

Back drilling side-to-side "L" angle supports

' style=

Drilling upper holes in side

Drilling upper holes in side "L" angle supports

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.