1. Re-clecoed baggage floor support "L" brackets in two places. 2. Clecoed front floor support "L" brackets into position. 3. Positioned baggage floor 6B16-1 atop floor supports. 4. Cursed and clecoed baggage floor into place. 5. Clecoed front corner "L" backets into place above floor. 6. Clecoed 6B12-2 to aft edge of floor. 7. Riveted floor and supports into place with A4 rivets. 8. Riveted 6B12-2 to side of fuselage with A5 rivets. 9. Riveted adel clamps to aft edge of floor to carry comm antenna coax.
Note: Manual rivet puller used in many areas to get proper clearance. Some rivets were pulled from the bottom, because the top was not accessible. This is a very long tir9ing, and painful process.