KitLog pro

Powered By Kitlog Pro v2.0

Jims Web Site
' style=
Date:  4-27-2010
Number of Hours:  5.30
Manual Reference:  6B16
Brief Description:  Installed baggage floor

1. Re-clecoed baggage floor support "L" brackets in two places.
2. Clecoed front floor support "L" brackets into position.
3. Positioned baggage floor 6B16-1 atop floor supports.
4. Cursed and clecoed baggage floor into place.
5. Clecoed front corner "L" backets into place above floor.
6. Clecoed 6B12-2 to aft edge of floor.
7. Riveted floor and supports into place with A4 rivets.
8. Riveted 6B12-2 to side of fuselage with A5 rivets.
9. Riveted adel clamps to aft edge of floor to carry comm antenna coax.

Note: Manual rivet puller used in many areas to get proper clearance. Some rivets were pulled from the bottom, because the top was not accessible. This is a very long tir9ing, and painful process.
' style=

baggage floor supports in place

baggage floor supports in place

' style=

positioning the baggage floor

positioning the baggage floor

' style=

hand riveting baggage floor

hand riveting baggage floor

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.