Brief Description: Temporary installation of brakes
1. Temporarily installed axle, and half of brake cylinder, on stbd gear. 2. Used other half of brake cylinder to tentatively mark metal to be removed from stbd gear. 3. Cut away largest amount of metal with cut-off wheel. 4. Iteratively used power rasp, file, and cut-off wheel to allow brake to fit. 5. Smoothed area with cut-off wheel, file, and small rotary sander. 6. Installed axle and brake for final fit check. 7. Repeated steps 1-6 for port side.