KitLog pro

Powered By Kitlog Pro v2.0

Jims Web Site
' style=
Date:  7-5-2012
Number of Hours:  12.00
Manual Reference:  (none)
Brief Description:  Moving aircraft

1. The wing cradle was moved to, and mounted on, the flat bed trailer.
2. As wings were painted, they were moved to the cradle, and secured in place.
3. The horizontal stabilizer was moved to the cradle, and secured.
4. The trailer was moved to the airport, and the wing cradle removed.
5. Since the landing gear was slightly wider than the trailer bed, a 2x4 and 2x6 shelf was added to the trailer to acommodate the fuselage.
6. The fuselage was ramped onto the trailer, and secured.
7. The trailer was moved to the airport, and the fuselage removed.
' style=

Fuselage on trailer

Fuselage on trailer

' style=

fuselage in hangar

fuselage in hangar

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.