KitLog pro

Powered By Kitlog Pro v2.0

RVGator
' style=
Date:  8-1-2012
Number of Hours:  4.50
Manual Reference:  
Brief Description:  2. Riveted on floor.

I have to wait on the left main fuel line until after I re-install the fuel selector. So to get going on this I decided it was time to rivet the floor. I gathered the parts and riveted as far as I could before I ran out of the pop rivets, I am about 53 rivets short to be able to finish the floor and also have some for the baggage floor. Short changed again on the order. I also need the rubber wing root seal so I will be calling Van’s to get the missing parts.

I then started to fit the horizontal stabilizer. I leveled the plane again to double check the stab and it was dead on from when I fit it a couple of years ago.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.